Building work and maintenance in Maarssen, at a fixed price for the work as described and paid in four instalments.

Maarssen has been part of the municipality of Stichtse Vecht since 2011 and consists, in building terms, of two worlds with nothing in common. On the east side lies Maarssen-Dorp: the old ribbon development along the river Vecht, with the Straatweg, the Zandpad and the Diependaalsedijk, much of it designated as a protected village area (beschermd dorpsgezicht). On the west side, behind the Amsterdam-Rijnkanaal, lies Maarssenbroek, built in the 1970s.

In the protected part, building work is mostly a question of what is allowed on the outside. Window layout, pointing, roof shape and window heights are largely fixed, which means an addition has to be found at the back. The houses along the Zandpad and the Diependaalsedijk also often sit on narrow plots with nowhere for a crane, so materials go in by hand. That is not an objection, but it belongs in the price rather than arriving as a surprise.

Further from the river, towards the Kaatsbaan and the Bisschopswetering, stands post-war housing where the usual work applies: a full width extension, an opening through to the kitchen and a dormer at the back. There the soil is sandy enough near the surface to use strip footings more often than in De Ronde Venen, which makes an extension measurably cheaper.

Street scene and building style in Maarssen. Generated image, not a job that was carried out.

What decides things here

  • Protected village area in Maarssen-Dorp: appearance, pointing and window layout are fixed
  • Narrow plots along the Zandpad and the Diependaalsedijk with no room for a crane
  • Sand and clay near the surface, so strip footings are more often possible
  • Permits run through the municipality of Stichtse Vecht

How building work in Maarssen runs

Nine steps. Each one states who is there, how long it takes and what you pay at that moment. On the steps where money actually changes hands, the amount is set in the heading face under "What you pay" and the step number is filled in. Handover is called oplevering in Dutch, and it is the step your contract will refer to.

  1. Step 1: Phone call

    You call, or leave a callback request. We ask about the type of work, the year the house was built, the place and roughly what you have in mind. By the end of that call you know whether this is work we take on and whether your budget and your plan meet. If they do not, we say so there and then.

    Who is there
    You and the work planner
    How long
    15 minutes, within one working day
    What you pay
    Nothing
  2. Step 2: Survey at your house

    We come round, measure up, look in the crawl space (kruipruimte) and the loft, and assess the foundation, the structure and the connections to the existing house. For a loft conversion or a structural opening we establish whether a structural engineer (constructeur) is needed. You hear on the spot which price range is realistic.

    Who is there
    You and the site manager
    How long
    45 to 90 minutes, within two weeks
    What you pay
    Nothing
  3. Step 3: Quotation with a fixed price

    You receive a quotation (offerte) with a fixed price for the work as described, a list of what is explicitly not included, and provisional sums (stelposten) for items you choose yourself. No figure in it is an estimate: what the quotation says stands, as long as the work does not change.

    Who is there
    We supply it, you read it
    How long
    Within five working days of the survey
    What you pay
    Nothing
  4. Step 4: Design, calculation and permit

    Only where the work requires it. Drawings, a structural calculation, and the permit application (omgevingsvergunning, the Dutch building permit) with the municipality of Stichtse Vecht or De Ronde Venen. If the permit is refused, the project stops and you pay for this phase only, at an amount stated on the quotation in advance.

    Who is there
    Draughtsman, structural engineer and the municipality
    How long
    4 to 12 weeks, depending on the procedure
    What you pay
    The cost of this phase, named separately on the quotation
  5. Step 5: Planning and start date

    The start date is fixed in writing, with a week by week plan and the days on which it will be loud or dusty. Materials with long lead times are ordered in this phase, so the job does not come to a halt halfway through waiting for a window frame.

    Who is there
    You and the work planner
    How long
    1 to 2 weeks
    What you pay
    Nothing
  6. Step 6: Work starts on site

    Day one: fencing, floor protection, a place to unload, and demolition. From this day there is one site manager who is your point of contact and whom you can call directly on working days.

    Who is there
    The site manager and the crew
    How long
    Day 1
    What you pay
    First instalment: 30 per cent
  7. Step 7: Shell complete

    Foundation, structure, brickwork, roof and window frames are in place and the work is wind and watertight. This is the moment you can stand in the new space for the first time, and the last moment changes are possible without demolition.

    Who is there
    The site manager walks it through with you
    How long
    Depends on the job, usually after 3 to 6 weeks
    What you pay
    Second instalment: 30 per cent
  8. Step 8: Services and fit-out

    Electrics, water, heating and ventilation are installed and tested. Then plastering, floors, tiling and painting. This phase is quiet but long; it is the phase in which people get impatient and in which the weekly plan matters most.

    Who is there
    Installer, plasterer and fit-out crew
    How long
    2 to 5 weeks
    What you pay
    Third instalment: 30 per cent
  9. Step 9: Handover and snagging list

    We walk the work through together and write down everything you see, however small. In Dutch this step is the oplevering and the list is the opleverlijst. That list is cleared within fifteen working days. Only once every point on it is signed off does the last instalment fall due.

    Who is there
    You and the site manager
    How long
    1 to 2 hours, points cleared within 15 working days
    What you pay
    Final instalment: 10 per cent, after the snagging list is cleared

The payment schedule

Nothing is paid in advance before work starts.

Each block in the bar is as wide as its share of the contract sum (aanneemsom). The pale block on the right is the final 10 per cent: it only falls due after handover (oplevering), once every point on the snagging list has been dealt with.

Payment schedule in four instalments, with the share of the contract sum and the moment of payment
InstalmentShareWhen
First instalment30%The day work starts on site
Second instalment30%Shell complete, the work is wind and watertight
Third instalment30%Services tested and fit-out complete
Final instalment10%After handover, once every snagging point is cleared
Together100%

The cost of drawings, the structural calculation and the permit sits outside these four instalments and is named separately on the quotation, so you can see what you would be out of pocket if a permit is unexpectedly refused. The total being paid in instalments is the contract sum, called the aanneemsom in your contract.

Questions about building work in Maarssen

Can I extend if my house is inside the protected village area?

At the rear, often yes; on the street side, almost never. Inside a beschermd dorpsgezicht the exemption for permit-free building is restricted, so a permit is normally required. We check it per address with the municipality of Stichtse Vecht before you receive a price.

Can a crane reach the plots on the Zandpad?

On most of them, no. Materials then go over a walkway, through the garden, or in with a telehandler from the road under a temporary road closure. That costs extra hours and they appear separately in the quotation, so you can see what the location costs and what the work costs.

How long does a permit procedure take in Stichtse Vecht?

For a standard application we reckon on eight weeks, with the possibility of an extension. If the house sits inside a protected village area or is listed, a second assessment is added and it usually runs up to three or four months.

Talk through your plan in Maarssen

Calling is quickest. In fifteen minutes you know whether this is work we take on and whether your plan and your budget meet.

Other places in our area

Ask us to call you back

Six questions. With these answers we can tell you in the first call whether your plan fits your budget, instead of finding that out after a visit.

The year the house was built, roughly what you have in mind, whether a drawing already exists.

Your details are used only to contact you about this request. How long we keep them is set out in the privacy statement, linked at the bottom of every page.

Call usCall me back